Build a Built-In Wardrobe With IKEA PAX Doors in 9 Steps for 35% More Storage
A standard freestanding PAX frame leaves a gap of 8 to 12 cm above the cornice and a dead zone behind the plinth. Boxing the unit into the wall recovers that volume, and in a typical 2.4 m alcove the gain runs close to a third over the same footprint left freestanding. The work splits into nine discrete steps, three of which are measurement, not assembly.
Measure the alcove three times before you order a single frame
PAX frames ship in three widths, 50, 75 and 100 cm, and in heights of 201 and 236 cm. The 236 cm frame in a room with a 240 cm ceiling leaves only 4 cm of headroom, which is too tight to tilt the frame upright once it is built. That single constraint dictates almost everything downstream. Measure the alcove width at floor, mid-height and ceiling, because plastered walls in older properties commonly taper 1 to 2 cm across that span, and the narrowest reading is the one your frames have to clear.
Write down three widths, not one. If the wall closes in toward the ceiling, the frames go in at the floor reading and the gap at the top gets covered later by a filler. Order frame widths that sum to at least 6 cm under your narrowest measurement, leaving 3 cm of play each side for scribing and final adjustment. A run measured at 248 cm narrowest takes two 100 cm and one 50 cm frame at 250 cm nominal, which does not fit, so the correct order is one 100 cm and two 75 cm frames at 250 cm. Recheck the arithmetic against the narrowest figure, not the widest, every time.
Why the plinth comes off and a timber base goes in
The PAX plinth that ships in the box sits the frame about 6 cm proud of the floor and is not load-rated for a fully boxed-in unit carrying a hanging rail packed solid. Replace it with a base frame made from 45 by 70 mm planed timber, screwed to the floor and levelled with plastic packers. This does two things at once: it lifts the carcass off a floor that is almost never flat, and it gives the front filler and skirting a solid timber edge to fix into later.
Level the base frame across its full length with a 1.2 m spirit level, packing the low end until the bubble centres. A 600 mm alcove floor commonly drops 3 to 5 mm front to back, and if you build the carcasses on an unlevelled base the doors will swing open or shut by themselves once hung. Run a continuous bead of construction adhesive under the timber before the final screws go in, then leave it overnight. The carcasses get assembled flat on the floor the next morning and lifted onto a base that no longer moves.
Step sequence, start to finish
The nine steps run in a fixed order because several of them block the ones after.
- Measure the alcove at three heights and order frames against the narrowest width.
- Strip the existing skirting from the alcove walls so the carcasses sit flush to plaster.
- Build and level the timber base frame, glue and screw to floor.
- Assemble each PAX carcass flat, but leave the back panel until the unit is upright.
- Lift carcasses onto the base, clamp them together side by side, and check plumb.
- Fix each carcass to the wall through the rear rail using the supplied bracket.
- Fit the back panels now that the units are square and anchored.
- Scribe and fit the side and top filler panels to close the wall gaps.
- Hang doors last, adjust hinges, then add cornice and new skirting.
Damage-free wall fixing is realistic only for the lightest configurations. A single 50 cm frame with shelving and no hanging rail can sit on a heavy-duty adhesive mounting strip rated to 7 kg per pair, but a boxed-in run carrying coats will pull any adhesive product off the wall within weeks. Use the steel L-bracket that ships with PAX and drive it into a stud or into a plasterboard wall with a metal toggle anchor rated to 25 kg. Find the studs with a detector before you commit, because a 100 cm frame loaded with winter coats can carry 40 to 50 kg, and that load wants two fixings minimum into something solid.
Scribing the filler panels is where the built-in look is won or lost
The gap between the carcass side and the alcove wall is rarely parallel. A panel cut to a straight line will show a tapering shadow gap of 2 to 8 mm against a wall that bows, and that taper is the single detail that reads as freestanding furniture pushed into a corner. Scribing transfers the exact wall profile onto the panel so it sits tight along its whole length.
Cut a filler panel from 18 mm MDF, 30 to 40 mm wider than the largest gap. Stand it against the carcass face, plumb, with the cut edge running into the wall. Set a compass to the widest point of the gap, run the point down the wall and the pencil along the panel, and it traces the wall contour onto the board. Cut to that pencil line with a jigsaw held at a slight back-bevel of about 5 degrees so the front edge meets the wall first. Test fit, shave the high spots with a block plane, and repeat until the front edge sits closed along its full height. The top filler that closes the gap to the ceiling gets the same treatment, scribed to whatever slope the ceiling actually has.
Fix the fillers to the carcass edge and to the timber base, not to the wall, so seasonal movement in the plaster does not crack the joint. A 1 to 2 mm reveal between the carcass and the filler, kept consistent, looks deliberate. A 6 mm reveal at the top closing to 1 mm at the floor looks like an error, which is what it is.
Doors, hinges and the 35 mm cup
PAX hinges are soft-close, 35 mm cup, with three-way adjustment: depth, height and lateral. Hang every door before adjusting any of them. The lateral screw moves the door sideways to even the gap against its neighbour, the depth screw pulls the door in or out from the frame, and the height is set by loosening the mounting plate on the carcass. Aim for a consistent 3 mm gap between adjacent door edges along the full run.
Mirror-front and high-gloss doors weigh noticeably more than the plain white panels, and a 50 by 229 cm mirror door needs the heavier hinge count, four per door instead of three. Hinges that are set too loose let a tall door sag at the leading edge over a few months, opening the bottom gap to 5 or 6 mm while the top stays at 3 mm. The fix is the depth and height screws, a quarter turn at a time, checked against a steel rule held across both doors.
A worked volume example
Take an alcove 248 cm wide, 250 cm high, 60 cm deep. Two 75 cm and one 100 cm PAX frame at 236 cm height fill the width and stand 201 or 236 cm tall. With the 236 cm frames, the dead space above is the 14 cm strip to the ceiling across the full 250 cm width and 60 cm depth, which is about 0.21 cubic metres recovered by the top filler and an internal top shelf.
Freestanding, the same frames sit on a 6 cm plinth and stop 14 cm short of the ceiling, and the inaccessible volume above the cornice plus the gap behind the plinth comes to roughly 0.3 cubic metres of the alcove going unused. Boxed in with a timber base and a top shelf added inside the carcasses, most of that returns as shelving. Against an internal usable volume of about 0.9 cubic metres in the freestanding setup, recovering 0.3 lands the built-in near 1.2 cubic metres, a gain in the region of a third.
Cornice last, and why
The cornice and the new skirting go on after the doors are hung and adjusted, never before. Fit them early and you lose access to the top hinge plates and the levelling packers under the base. Mitre the cornice at 45 degrees for the internal corners against the side walls, pin it to the top filler with 25 mm panel pins, and fill the pin holes before painting.
A question the nine steps leave open is what happens at the ceiling itself when the plaster line waves by more than the 5 degree back-bevel a jigsaw blade will hold. At that point the top scribe stops being a single cut and becomes a decision about whether to skim the ceiling flat first or accept a caulked joint that no amount of compass work will hide.