Up to 40% Faster Jointing from a Squeegee Method on a 45-Square-Metre Vitrified Deck

August 26, 2026 by Consumer Team · 7 min read

On a 45-square-metre Marshalls vitrified terrace, a squeegee flood method brought jointing down from about ten hours to roughly six. The gain came from a resin slurry that cleans off low-porosity porcelain, plus a base and fall set before the grout arrived.

Up to 40% Faster Jointing from a Squeegee Method on a 45-Square-Metre Vitrified Deck

Start with the number that tends to appear on job sheets: a two-person crew hand-pointing 45 square metres of 600 by 600 vitrified slabs will use up most of a working day. Change the pointing stage to a squeegee-applied slurry grout, mixed so it self-levels into the joint and wipes clean from a low-porosity surface, and the same deck closes in roughly six hours instead of ten. That is the 40 percent figure, and it depends on vitrified porcelain absorbing so little of the grout residue that sandstone-style staining does not take hold.

The flood-and-squeegee approach suits dense porcelain with a smooth face. Use the same resin slurry across riven Indian sandstone and the saved time is likely to be spent scrubbing haze from the texture.

Where the squeegee method saves the hours

Hand-pointing is a sequence of small repeated actions: load the pointing bar, work along one joint, strike it, move to the next line. On 45 square metres of 600mm units, the joint length runs somewhere north of 300 linear metres. Every metre asks for another pass of the bar.

The slurry method changes the pace of the operation. A batch of resin-modified grout is mixed to a pourable consistency, tipped across a section of about four square metres, and drawn diagonally across the joints with a rubber-bladed squeegee. Gravity and blade pressure fill the joints in a single pass. A second pull with a near-dry squeegee lifts the surplus from the face.

On vitrified porcelain, the faint film left after that pull flashes off and can be buffed away with a dry emulsifying pad before it keys into the surface. That clean release is the reason the method works on this material.

The saving sits almost entirely inside the pointing phase. Sub-base preparation, laying, and cross-fall setting take the same time as they did with hand work. On a hand-pointed porcelain terrace, pointing is often the longest task after the slabs are down, so cutting that stage by around half pulls the whole job toward the 40 percent headline. On textured stone, the cleaning time takes back much of the gain.

Batch discipline matters more than the elegance of the squeegee stroke. Resin slurries have a working window, often 30 to 60 minutes depending on ambient temperature. Once a batch starts to green off, it drags across the surface and leaves streaks. Mix only the area that can be flooded and cleaned inside that window. On a warm afternoon that may be three square metres per batch; in cool spring conditions it may stretch to five or six.

The base under the grout

A squeegee joint over a failing base is a quick route to cracked paving, so the ground build comes first.

For a permeable build, the sub-base specification changes from the material used below many bound patios. MOT Type 1 is engineered to hold fines and lock up tight. A permeable deck needs voids, so the preparation uses an open-graded aggregate, often 4/20 or 2/6.3 clean stone with the fines washed out. Water can then pass vertically through the build instead of ponding below the slabs. Compact in layers of no more than 100mm with a plate compactor, and watch for the stone being driven into a soft subgrade below, which chokes the voids just created.

Block paver bedding depth is a related discipline that often gets carried from one project type to another. On a segmental block drive, the laying course is typically 30 to 50mm of grit sand or 2/6.3 grit, screeded and left uncompacted until the blocks are vibrated in. Large-format vitrified porcelain needs a full mortar bed or a proprietary primer-and-mortar system. A loose bedding course under a 20kg slab allows rocking under point load and sets up movement in the joint.

Cross-fall is measured work

Porcelain paving cross-fall usually gets noticed after the first standing puddle forms and freezes. The working figure many landscapers hold to is a fall of 1 in 80, equal to 12.5mm of drop per metre run. On a 45-square-metre deck laid six metres deep, that gives 75mm of fall from the house wall to the drainage edge.

Set that fall with a laser level or a long spirit level and a measured packer. Vitrified porcelain can look flat to the eye even when it runs the wrong way, because the uniform surface gives few texture cues. The same uniformity that lets a slurry clean off so neatly also hides a poorly surveyed fall until water sits on the finished paving.

Where the fall runs toward the building, or where a terrace meets a threshold that cannot take the water, the usual answer is a linear channel. ACO drainage channel install work sits at the low edge: dig the channel run to the invert level required by the fall calculation, bed the channel body in a concrete haunch on both sides so it cannot float or tip, and set the grating a hair below the finished slab surface. Water then sheets into the channel instead of skating over the top. An invert error of 10mm across a 45-square-metre catchment can create a puddle at the point intended to receive the runoff.

Primer on porcelain

Porcelain has near-zero absorption, so the mortar bed needs a slurry primer painted onto the back of the slab or delamination can follow. That single skipped step accounts for a large share of failed vitrified terraces.

Resin grout on sandstone

The squeegee method belongs with porcelain. Resin grout for sandstone flags is where many callbacks start, because all-in-one resin systems that self-clean from vitrified surfaces can lodge in the open pores and micro-pits of natural stone. Once cured, that residue sits as a dull film.

Two-part epoxy or hybrid resin grouts marketed for stone are formulated with a slower initial set and a defined washing-off procedure. The sequence is usually a wet sponge float, followed by a haze cure and a dry buff, sometimes over two sessions. Riven sandstone needs the grout kept in a controlled band. Brush or squeegee the material into the joints, then wash the face with the minimum water the product allows before the resin flashes into the surface. Too much water dilutes the resin at the joint face, weakening the top few millimetres that take foot traffic and weathering.

When a sandstone terrace picks up a resin haze, Lithofin patio cleaner is the product name that appears on trade forums, in acid-based and resin-film variants. It shifts cured film and cement bloom that plain water leaves behind. It is also strong enough to etch polished porcelain if the wrong bottle is used out of habit, which is the quiet risk of running mixed-material jobs from one van. Match the cleaner to the stone, dilute to the label, and test a spare offcut before applying it across 45 square metres of finished deck.

The temperature window is tighter on stone than on porcelain. Below about 5 degrees, the resin will fail to cure properly and can leave a permanently soft joint. Above 25 in direct sun, the surface flashes before washing is complete and the haze sets. Most stone resin failures trace back to grouting in the wrong weather window.

The math on a real batch

Run the numbers for the 45-square-metre porcelain deck. At roughly 300 linear metres of 8mm joint, 15mm deep, the joint volume comes to around 36 litres before waste. Resin slurry grout is typically sold in 15 or 20kg tubs with a stated coverage per unit. On 600 by 600 slabs at that joint size, the job points to three tubs plus a margin for any batch that greens off and goes in the bin.

Against labour, the comparison is direct. Hand-pointing that length at a steady one-and-a-half to two linear metres per minute, including reloading the bar and striking, runs to three or four hours of pure pointing for one person, and longer for a fussy struck finish. A squeegee flood, cleaned as it goes in four-square-metre bays, can close the same joints in under two hours for one person on a surface that releases the film cleanly.

The tub cost is higher than a bag of pointing mortar. On a paid crew, the labour saving usually clears that difference on a deck this size and keeps improving as the area grows.

On a terrace that mixes a vitrified main field with a natural stone step or border, treat the joint line as a material break during grouting. Stop the flood pull before the porous section, clean the porcelain field, then grout the stone with its own controlled wash-off procedure. The detail still left exposed is the single meeting line, where resin-rich wash water from the porcelain side can reach open stone before the installer sees the film forming.