7 Step Brick Path Laying Routine with Marshalls Pavers Over a 10-Metre Run

July 29, 2025 by Garden Content Team · 7 min read

A 10-metre by 1-metre brick path uses about 500 Marshalls clay pavers at 200mm by 100mm by 50mm, plus sharp sand and a compacted MOT Type 1 base. The routine below keeps the BS 7533 fall, edge restraint and dry compaction sequence in the right order.

7 Step Brick Path Laying Routine with Marshalls Pavers Over a 10-Metre Run

1. Set the datum, cross-fall and length fall

Drive two timber pegs at each end of the 10-metre run and pull a builder’s line tight between them. Treat that line as the finished paving height. Where the path runs near a house wall, keep the finished paver surface at least 150mm below the adjacent damp-proof course.

BS 7533-101 gives a cross-fall of 1 in 40 for shedding surface water. On a 1-metre-wide path, that means the lower edge finishes 25mm below the higher edge. A spirit level with a 25mm packer taped to one end gives a quick check as you transfer the height down the run at 2-metre intervals.

The length of the path also needs a set gradient. Across 10 metres, a 1 in 80 longitudinal fall drops the far end 125mm from the start. Mark each peg at screeded sand height, which is 50mm below the finished paver line. The 30mm sand bed sits above the compacted sub-base, and a boning rod cut to the depth from line to sub-base lets one person sight the excavation level without measuring each point again.

2. Excavate the 10 square metres

Dig to 200mm below finished paving level across the full 1-metre width. That depth allows for 100mm of compacted MOT Type 1, a 30mm laying course and the 50mm clay paver, with the remaining tolerance taken up during compaction. A 10-metre by 1-metre path gives 10 square metres of area, so the excavation removes 2 cubic metres of spoil. Since 1 cubic metre is 1000 litres, that is roughly 24 to 30 standard builder’s barrow loads, depending on the barrow size and how full each run is loaded.

Keep the sides of the excavation vertical and the base within 10mm of level against the datum. Use the boning rod under the line to check the depth along both edges and the centre. Soft patches where the spade drops in easily usually mean organic material or a previously backfilled service trench. Cut those patches out and refill them with Type 1 so the sub-base sits on firm ground.

Roots over 20mm diameter crossing the line are worth removing before the aggregate goes in. Clay pavers have no flexural reserve to bridge later heave from below, so a root left under the run can show up as a ridge after seasonal movement.

3. Build the MOT Type 1 sub-base

MOT Type 1 is graded limestone or granite aggregate running from 40mm pieces down to dust. For a 100mm compacted depth over 10 square metres, order about 2.3 tonnes, allowing for around 20 percent loss from loose tipped volume during compaction.

Spread the aggregate in two 50mm layers. A wacker plate working over a full 100mm depth in one lift leaves the lower band loose, so each layer needs its own compaction passes.

A Belle PCX 350 or similar 60kg to 80kg plate compactor is suitable for this size of path. Give each layer four passes, starting along the path and then crossing it. Before the final passes, dampen the Type 1 lightly with a watering can. The limestone fines bind better at a damp consistency and the compacted surface tightens into a hard skin.

Check the finished level after each layer with the boning rod. The top of the compacted sub-base should finish 80mm below the paving datum, leaving 30mm for sharp sand and 50mm for the clay paver.

Spend time on the margins. The plate will leave the last 50mm beside the excavation wall underworked, so tamp those strips by hand with the end of a fence post. A weak edge below the restraint is the first place a flexible path starts to spread sideways.

4. Fix the edge restraint before any loose sand

Clay pavers on a flexible path have no mortar joints between the field units. The 10-metre run depends on its edge restraint to stop sideways creep.

Set a concrete haunch using a C20 mix, four parts ballast to one part cement, against a temporary edge board or directly against marker pavers. Keep the haunch below the chamfer line of the paver so it disappears once the surface is finished.

Lay the two outside rows of pavers onto a stiff bedding mortar made from the same C20 mix where they meet the haunch. Bring the haunch up against their outer faces at about 45 degrees. Those mortared margins lock the sand-bedded field between them. Give the C20 24 hours to gain enough strength before loading the inner field, which makes the edge work a separate session from the main laying.

5. Screed sharp sand and place the field pavers

Use sharp grit sand for the laying course. Soft building sand holds excess water and slumps under load, which leads to rocking pavers within weeks.

The laying course is 30mm deep and must stay undisturbed after screeding. Place two screed rails, either 25mm box section steel or straight timber battens, along the path at the correct height below the datum line. Fill between them with sand and draw a straightedge along the rails to strike the surface off cleanly.

Across a 1-metre width, two rails are enough. Lift the rails out after screeding and fill the grooves with loose sand, working carefully so the struck surface keeps its level.

Marshalls clay pavers are typically 200mm by 100mm by 50mm. At that size, each paver covers 0.02 square metres, so a 10-square-metre path takes 500 full pavers before cuts and waste. Herringbone and stretcher bond both work across a 1-metre width.

Lay from one end and work forward. Kneel on a board laid over the pavers already placed, then set each new paver vertically into position and slide it tight to its neighbours. Leave a 2mm to 3mm joint. Individual pavers should sit a little proud at this point because the plate compactor settles the surface as one field.

Work a substantial section, around 200 pavers, before the first consolidation pass if the area is stable and the edges are already cured. Cut perimeter and feature pieces with a disc cutter or block splitter. Measure every cut against the actual gap, because a 10-metre run accumulates small dimensional drift that a nominal measurement will miss. A herringbone pattern creates two edge cuts per course, so order about 10 percent extra above the calculated 500 pavers for cuts and breakage.

For the consolidation run, fit the plate compactor with a rubber sole mat or proprietary paver protector. Make two passes along the length of the path. The pavers bed into the full 30mm sand course and the surface settles evenly. After the first pass, lift any low paver, add sand beneath it and relay it before the second pass.

6. Fill the joints dry

Kiln-dried jointing sand must go on dry. Brush it diagonally across the pavers with a soft broom so it falls into the 2mm to 3mm joints.

Run the plate compactor over the sanded surface again to vibrate the sand down. Sweep more sand across and repeat until the joints finish full to within 2mm of the chamfer top. A 10-metre run takes roughly 25kg of kiln-dried sand, with the exact amount depending on joint width and laying pattern.

The jointing sand is structural in a flexible pavement. It transfers load between neighbouring pavers so the field behaves as one surface, and full joints are what keep individual units from rocking under foot traffic.

7. Top up after rain, then leave the surface alone

After the first heavy rain, the initial jointing sand settles and partly empty joints can appear. Brush more kiln-dried sand in while the surface is dry. During the first few months, keep pressure washing off the new path, because a lance lifts unbound sand straight out of the joints and undoes the vibration work.

One thing only shows after the path has been used: whether those dry joints stay full once rain and foot traffic have worked the sand down.